Pool Remodeling

How Long Does a Typical Pool Remodel Project Take?

Imagine it’s a sunny Saturday afternoon, and you’re dreaming about the perfect pool party, but your pool is looking a little worse for wear. The tiles are chipped, the deck is cracked, and the overall design feels outdated. You know it’s time for a remodel, but you have one BIG question: How long is this going to take?

We understand your concerns and want to help you navigate this process with ease. Remodeling your pool is a significant project, but knowing what to expect can make it a lot less stressful. Let’s dive into the details of a typical pool remodel and how long you can expect it to take.

Factors That Affect Pool Remodeling Timelines

Size and Complexity of the Pool

The size and complexity of your pool play a major role in how long the remodel will take. A larger pool or one with intricate designs or custom features may require more time for demolition, preparation, and installation of new elements.

Type of Remodeling Work

The scope of work is another key factor. A simple resurfacing project will take far less time than a full structural remodel, which may involve reshaping the pool, adding water features, or installing a spa.

Weather and Seasonal Considerations

If you’re remodeling in an area prone to unpredictable weather (like summer monsoons in Arizona), be prepared for possible delays. On the flip side, remodeling in off-peak seasons could mean faster project completion due to contractor availability.

Average Pool Remodel Timeline by Type of Project

Simple Resurfacing

A typical pool resurfacing project, which includes removing the old surface and applying a new one (like plaster or pebble), usually takes about 1–2 weeks.

Equipment Upgrade (e.g., Pumps, Heaters, etc.)

Replacing or upgrading pool equipment, such as pumps, heaters, or filters, is a relatively quick project and can typically be completed within 2–3 days.

Full Pool Remodel

For a full pool remodel, where you’re updating the design, adding features, and making structural changes, the timeline is generally 4–8 weeks. This includes demolition, reconstruction, and finishing touches like new tiles, decking, and water features.

Step-by-Step Pool Remodeling Timeline

Planning and Design Phase (1–3 Weeks)

The first phase involves planning and designing your pool remodel.

  • Initial Consultation: Meet with a pool expert to discuss your goals, ideas, and budget.
  • Design Creation: Your designer will draft a detailed plan, including drawings, materials, and features.
  • Permits and Approvals: Depending on your location, you may need to obtain permits, which can take 1–2 weeks.

Demolition and Preparation (2–3 Days)

Once the design is finalized, the real work begins:

  • Draining the Pool: This process typically takes 1–2 days.
  • Removing Old Materials: Crews will remove old tiles, decking, and other outdated materials. This process can be noisy but is usually completed in 1–2 days.
  • Site Preparation: The area is prepped for construction, ensuring everything is in place to begin building.

Construction Phase (A Few Days to Several Weeks)

This is the heart of the remodel, where your pool starts to take shape:

  • Structural Changes: If you’re adding features like a spa or reshaping the pool, this could take anywhere from 1 week to several weeks, depending on the complexity.
  • Plumbing and Electrical: Updating the plumbing and electrical systems ensures your pool runs efficiently and safely.
  • Installing New Features: New tiles, water features, lighting, and other enhancements are added during this phase. The timeline here is highly variable based on the complexity of the features.

Finishing Touches (1–2 Weeks)

Once construction is complete, the final steps begin:

  • Pool Surfacing: Applying the final surface material (plaster, pebble, etc.) usually takes a few days to a week to cure properly.
  • Decking and Landscaping: If you’re also updating the deck or adding landscaping, this is completed towards the end.
  • Final Inspections and Cleanup: After everything is finished, the pool is inspected for safety and cleaned, ready for you to enjoy.

Can You Speed Up the Pool Remodeling Process?

Work with Experienced Contractors

Choosing experienced contractors can significantly reduce the chances of delays and ensure the job is done efficiently and on schedule.

Prepare for the Project

Ensuring that all necessary permits, materials, and plans are in place before work begins will minimize potential delays.

Permitting and Approval Timelines

Apply for permits as soon as possible. Delays in permits can hold up the entire project.


FAQs About Pool Remodeling Timelines

How Long Does It Take to Get Permits for a Pool Remodel?

The time it takes to get permits varies depending on your location and the complexity of the remodel, but it usually ranges from 1 to 2 weeks.

What Are Common Delays in Pool Remodels?

Common delays include waiting for materials to arrive, unexpected weather, and contractor availability.

Can You Remodel a Pool During Any Time of Year?

While you can remodel a pool year-round, spring and summer tend to be the busiest times for contractors, which could extend the timeline.

How Do I Know If My Pool Needs a Remodel or Just Repairs?

If you’re experiencing frequent repairs, or if your pool’s aesthetic is outdated and the equipment is inefficient, it may be time for a full remodel.


A pool remodel is a fantastic way to rejuvenate your backyard and create a more enjoyable outdoor space. While the process can take anywhere from a few weeks to a couple of months, the result is well worth the time and effort. By understanding the timeline and what to expect, you can confidently plan your project and look forward to a beautiful, upgraded pool.

Dhruv Gangwal

Recent Posts

How to Shop for a New Pool in Arizona: Avoid Hidden Costs & Frustrations

Shopping for a swimming pool should be exciting, BUT it’s often frustrating due to a…

2 weeks ago

Should You Wait Until After the 2024 Election to Buy a Pool? Here’s What You Should Know.

The Election Dilemma – Thinking about getting a pool, but unsure if the 2024 election…

1 month ago

Should I Wait for Lower Interest Rates to Buy a New Pool in 2025? Comparing The Cost To Material Cost Increases.

If you're thinking about building a pool, you've likely heard the advice: "Wait until interest…

2 months ago

Heated Pools vs. Non-Heated Pools in Arizona

Should You Heat Your AZ Pool? (We Say Yes!) Is a Pool Heater Worth it…

2 months ago

Top 5 Must-Have Features for Your Arizona Pool in 2024 | Shasta Pools

The Top 5 Must-Have Features for Your Arizona Pool in 2024. Imagine it’s another sunny…

3 months ago

Saltwater Pools: The Untold Truth Every Homeowner Should Know

If you're considering installing a pool in your backyard or changing your existing pool sanitation…

3 months ago