Imagine it’s a sunny Saturday afternoon, and you’re dreaming about the perfect pool party, but your pool is looking a little worse for wear. The tiles are chipped, the deck is cracked, and the overall design feels outdated. You know it’s time for a remodel, but you have one BIG question: How long is this going to take?
We understand your concerns and want to help you navigate this process with ease. Remodeling your pool is a significant project, but knowing what to expect can make it a lot less stressful. Let’s dive into the details of a typical pool remodel and how long you can expect it to take.
The size and complexity of your pool play a major role in how long the remodel will take. A larger pool or one with intricate designs or custom features may require more time for demolition, preparation, and installation of new elements.
The scope of work is another key factor. A simple resurfacing project will take far less time than a full structural remodel, which may involve reshaping the pool, adding water features, or installing a spa.
If you’re remodeling in an area prone to unpredictable weather (like summer monsoons in Arizona), be prepared for possible delays. On the flip side, remodeling in off-peak seasons could mean faster project completion due to contractor availability.
A typical pool resurfacing project, which includes removing the old surface and applying a new one (like plaster or pebble), usually takes about 1–2 weeks.
Replacing or upgrading pool equipment, such as pumps, heaters, or filters, is a relatively quick project and can typically be completed within 2–3 days.
For a full pool remodel, where you’re updating the design, adding features, and making structural changes, the timeline is generally 4–8 weeks. This includes demolition, reconstruction, and finishing touches like new tiles, decking, and water features.
The first phase involves planning and designing your pool remodel.
Once the design is finalized, the real work begins:
This is the heart of the remodel, where your pool starts to take shape:
Once construction is complete, the final steps begin:
Choosing experienced contractors can significantly reduce the chances of delays and ensure the job is done efficiently and on schedule.
Ensuring that all necessary permits, materials, and plans are in place before work begins will minimize potential delays.
Apply for permits as soon as possible. Delays in permits can hold up the entire project.
The time it takes to get permits varies depending on your location and the complexity of the remodel, but it usually ranges from 1 to 2 weeks.
Common delays include waiting for materials to arrive, unexpected weather, and contractor availability.
While you can remodel a pool year-round, spring and summer tend to be the busiest times for contractors, which could extend the timeline.
If you’re experiencing frequent repairs, or if your pool’s aesthetic is outdated and the equipment is inefficient, it may be time for a full remodel.
A pool remodel is a fantastic way to rejuvenate your backyard and create a more enjoyable outdoor space. While the process can take anywhere from a few weeks to a couple of months, the result is well worth the time and effort. By understanding the timeline and what to expect, you can confidently plan your project and look forward to a beautiful, upgraded pool.
Shopping for a swimming pool should be exciting, BUT it’s often frustrating due to a…
The Election Dilemma – Thinking about getting a pool, but unsure if the 2024 election…
If you're thinking about building a pool, you've likely heard the advice: "Wait until interest…
Should You Heat Your AZ Pool? (We Say Yes!) Is a Pool Heater Worth it…
The Top 5 Must-Have Features for Your Arizona Pool in 2024. Imagine it’s another sunny…
If you're considering installing a pool in your backyard or changing your existing pool sanitation…